Hyderabad Jobs |
Banglore Jobs |
Chennai Jobs |
Delhi Jobs |
Ahmedabad Jobs |
Mumbai Jobs |
Pune Jobs |
Vijayawada Jobs |
Gurgaon Jobs |
Noida Jobs |
Hyderabad Jobs |
Banglore Jobs |
Chennai Jobs |
Delhi Jobs |
Ahmedabad Jobs |
Mumbai Jobs |
Pune Jobs |
Vijayawada Jobs |
Gurgaon Jobs |
Noida Jobs |
Oil & Gas Jobs |
Banking Jobs |
Construction Jobs |
Top Management Jobs |
IT - Software Jobs |
Medical Healthcare Jobs |
Purchase / Logistics Jobs |
Sales |
Ajax Jobs |
Designing Jobs |
ASP .NET Jobs |
Java Jobs |
MySQL Jobs |
Sap hr Jobs |
Software Testing Jobs |
Html Jobs |
Job Location | Ghaziabad |
Education | Not Mentioned |
Salary | Not Disclosed |
Industry | Recruitment Services |
Functional Area | General / Other Software |
EmploymentType | Full-time |
At machine start up1) Ensure the Labels for the next job is perfectly matched and ready2) Make sure material for next 2 jobs is ready3) Set up machine as per the specification sheeta. For Polytype and Flexo use recipes (to be developed)b. For other machines use spreadsheet with standard values (to be developed)c. Report to Mathew and Swain if machine does not work on standard value4) Set registration as per shrink positive5) Check colors against shade card6) Check whether the texts are perfect as per artwork7) Check specs and correct lacquer and confirm whether it is under or over lacquer8) Make sure auto ejector is running9) Inform inspector for set up approval10) Fill the set up approval before starting production11) If required make shade card at job start up and submit to QCAt machine restart1) Ensure if tubes are OK including text matter2) Ensure all colors registration is as per artwork3) Check that shade is OK4) Remove all start up and out of shade tubesContinuous checking1) Check shades every 10- 15 minutes2) Check Registration every 5 minutes3) Check Text every 10- 15 minutes4) If any problems occurs, stop machine and fix the problema. Inform packers to segregate bad tubes after showing problem to packers and QCb. Make sure segregation is done and boxes with unsegregated tubes are marked with yellow tape and kept in segregation areaAt the end of production1) Complete line clearancea. Make sure all tubes from heading or extrusion (if sleeve printing) have been printed as instructed by Printing Manager or Plant Manager (These numbers have to be provided by MP or PM every dayb. Ensure all the printed tubes are packed and removed from linec. Make sure printing area is clear from previous job tubes including samplesd. Enter line clearance timee. Fill in production modulei. Note all approximate machine downtime for breakdown or preventive maintenance and other problemf. Ensure job details , ink and anilox roller details are enteSalary Not Disclosed,
Keyskills :
printbrokering preventivemaintenance it ink set tape flexo texts specs salary labels shades roller packers lacquer extrusion breakdown inspection maintenance nf